Project

 

The southern extension of the Paris metro line 14 allows the connexion of the current terminus station at Olympiades with the future TOD (Traction Maintenance Depot) at Morangis, after crossing the Orly Airport (future new terminus of the line).

 


Services

 

setec tpi leads the Design & Construction Joint Venture. setec tpi provides all the services ranged in the French MOP law (Maîtrise d’Ouvrage Publique), from the start of the scheme design to the commissioning.

 

 


L’essentiel

 

Client : RATP

Maitrise d’oeuvre infrastructures : Groupement Elios

Engineering and Project Management Joint-Venture : setec tpi mandataire, Systra

Architects : Groupe-6, Jean-Paul Viguier et associés, Franklin Azzi Architecture, Brunet Saunier Architecture, Valode & Pistre

setec groupe partners : setec bâtiment, terrasol, planitec btp, hydratec.

`

Period :

  • Design: 2015 – 2018
  • Construction: 2018 – 2024 (expected)

 

©Anne-Claude Barbier pour setec tpi

Quarries Treatments


The final alignment comprises 1.6km under old limestones quarries in the Kremlin-Bicêtre area. In advance of the TBM, specific soil characterisation and filling works must be undertaken for stabilisation purposes.


TBM Allison : Emergency shaft Jean Prouvé at Villejuif


26T of electrical cables are required to link the back of the TBM and the steering station.